How long does a bespoke kitchen installation take?

A complete bespoke kitchen installation typically takes between 10 and 14 weeks from your initial enquiry to the final signed-off fitting. The physical installation inside your home usually spans one to three weeks, depending on the structural complexity of the cabinetry and your chosen worktops. The vast majority of this timeframe is spent on detailed spatial design, precise laser measuring, and custom workshop manufacturing before our fitters ever set foot on your property.

Key Points:

  • The overall end-to-end timeline from initial enquiry to final handover is approximately 10 to 14 weeks.

  • Physical installation works inside your property generally take between one and three weeks.

  • Custom workshop manufacturing is the longest single phase because every cabinet is built entirely to order.

  • Templating natural stone or quartz worktops creates a necessary pause during the active fitting period.

  • The most common project delays stem from late client design alterations or supply chain issues with appliances.

390c7c 7f4deb18414c4fe0a2977b6e03eacf1amv2 2

What is the timeline from first enquiry to finished kitchen?

The entire journey from your initial phone call to stepping into your finished room spans roughly 10 to 14 weeks, broken down into clear design, production, and installation stages. Rushing any single stage of this process risks compromising the precise fit and long-term durability of your bespoke cabinetry.

The process begins with an initial home visit, laser survey, and design phase, which usually takes between two and three weeks to finalize. During this time, we explore various floorplan layouts, test material samples against your natural lighting, and refine every custom storage feature until you are completely happy with the plans.

Once you sign off on the detailed technical drawings, your project moves directly into our dedicated manufacturing workshop. Building completely custom units from raw materials takes approximately six to eight weeks, as every carcass, door, and drawer box must be individually cut, jointed, and finished. Finally, the physical installation on-site takes between one and three weeks, concluding with a comprehensive final inspection and handover.

How is the physical installation broken down by stage?

The physical installation period in your property follows a strict sequence: rip-out, first-fix preparation, cabinetry fitting, worktop templating, second-fix trades, and final commissioning. Each step must occur in exact order so that sub-contractors are not working over one another.

During the first few days, our team strips out your old kitchen cabinets, flooring, and wall tiles down to the raw structure. Electrical contractors and plumbers then complete the “first-fix” phase, running new wiring cables and pipework behind the walls to match the new layout. Wall surfaces are plastered smooth where necessary, requiring a short drying period before cabinetry installation can safely begin.

Next, our joiners arrive to install the bespoke floor and wall units, carefully scribing every end panel directly to the contours of your walls. Once all base cabinets are perfectly level and anchored, a specialist stone mason visits the site to create precise templates for your worktops. While those worktops are being cut in a factory, our team fits wall-mounted units, internal pull-out mechanisms, and decorative cornices. Once the solid surfaces arrive and are secured, the plumbers and electricians return for the “second-fix” phase to connect sinks, taps, hobs, and lighting.

Installation PhaseTypical DurationPrimary Activities
Initial Survey & Design2–3 WeeksRoom measurements, spatial layout plans, material choices, and technical sign-off.
Workshop Manufacturing6–8 WeeksBuilding custom cabinet carcasses, crafting timber doors, and applying finishes.
Site Prep & Rip-Out2–4 DaysRemoving old units, updating first-fix plumbing, laying electrical wiring, plastering.
Cabinetry Fitting3–6 DaysErecting base and wall units, scribing panels, fitting internal storage components.
Worktop Fabrication5–7 DaysLaser templating on-site, off-site cutting/polishing of stone, final surface fitting.
Second-Fix & Handover2–3 DaysConnecting appliances, plumbing sinks/taps, final door alignment, snagging check.

What honestly causes delays during a kitchen installation?

The most frequent causes of project delays are late modifications to the approved design plans, hidden structural defects exposed during rip-out, and late deliveries of third-party appliances. Understanding these risks beforehand helps keep your project running smoothly on schedule.

If you decide to change cabinet dimensions, relocate an island, or alter material specifications after workshop manufacturing has already commenced, production must pause immediately. New components must be re-drafted and queued for cutting, which can add weeks to the manufacturing phase. We strongly urge clients to finalize every detail before approving the production drawings.

Unforeseen issues hidden behind existing cabinets are another common disruptor. Removing old units can occasionally reveal sub-standard historical wiring, leaking pipes, decaying floor joists, or uneven brickwork that fails building regulations. Fixing these underlying issues requires extra time and labor before new units can safely be installed. Finally, ordering integrated appliances from external manufacturers well in advance avoids situations where our fitters are left waiting for a missing oven or hob before finishing a run of units.

3ae506 c49562f07e8c43b982c3df6745dcbdbamv2

How does choosing bespoke compare to an off-the-shelf fitting timeline?

While off-the-shelf flat-pack kitchens can sometimes be delivered faster because components are kept in stock, the overall installation timeline is often surprisingly comparable to a bespoke build. Mass-produced units are manufactured to standard grid sizes, meaning fitting them into real-world rooms requires awkward filler panels and extensive on-site modifications.

Bespoke joinery demands a longer manufacturing phase upfront because every item is made to order. However, because components are engineered in the workshop to fit your room’s exact dimensions, the actual on-site assembly phase is much cleaner and more efficient. Off-the-shelf projects frequently encounter delays on-site when standard cabinets collide with pipe runs or uneven walls, requiring fitters to adapt flat-pack units manually in your home.

Furthermore, off-the-shelf installations frequently rely on separate, uncoordinated sub-contractors, which can lead to downtime between trades. A dedicated bespoke team manages every phase under one roof, ensuring that electricians, plumbers, joiners, and stone masons arrive in seamless succession to keep your home renovation moving forward without unnecessary pauses.

Frequently Asked Questions

When during the fitting process are stone worktops templated?

Worktop templating occurs only after all base cabinets are permanently installed, levelled, and fixed into position. Because materials like quartz, granite, or solid marble must be cut to tolerances of a single millimetre, the template cannot rely on original paper drawings alone. The fabrication phase typically takes 5 to 7 working days from the moment the templater leaves your home.

Will my home be without a working sink or cooker for weeks?

You will be without your main kitchen sink and primary cooking appliances during the active fitting period. However, a professional fitting team will always help set up a functional temporary kitchen in another room. This usually includes reconnecting your old washing machine, setting up a temporary microwave/induction ring station, and providing a temporary water supply where plumbing layout permits.

Do I need to organise separate plumbers and electricians for the project?

No, you do not need to coordinate independent sub-contractors yourself. We manage the entire schedule from start to finish, bringing in fully accredited, registered electricians and Gas Safe engineers at the exact moments required. This eliminates the common stress of trades cancelling or turning up in the wrong order.

Can we live in the house while a kitchen installation is happening?

Yes, the vast majority of our clients remain living in their homes throughout the installation process. While there will inevitably be noise, dust, and minor disruption during the initial rip-out phase, our fitting team isolates the working area with protective sheeting and cleans up the workspace at the end of every working day.

How far in advance should I book my bespoke kitchen project?

Due to the workshop manufacturing time required for custom joinery, we recommend booking your project at least 3 to 4 months before your ideal completion date. If your project involves wider structural building work or extensions, getting us involved during the architectural planning stage yields the best design results.

Explore Our Portfolio

Dive into our gallery to see the stunning transformations we’ve achieved for our clients. Each project reflects our dedication to quality, detail, and client satisfaction.

Ready to bring your vision to life?

Contact us today to schedule a home appointment and take the first step towards transforming your space.